A writing workspace that understands your whole project.
Research, organize, write, verify, revise, and export in one workspace that holds your entire manuscript in context — every chapter, every source, every claim.

Built for serious long-form writers
Why Syntaxer
Generic AI tools solve the blank page. Syntaxer solves the 300-page project.
AI chat knows nothing about your book.
Syntaxer holds your entire manuscript in context — every chapter, every claim, every source — at once.
Chat generates. You still have to manage.
Syntaxer organizes, verifies, cross-references, and tracks your project as a structured body of work.
300 pages can't fit in a chatbox.
Every feature — claims, citations, revision history, research — is designed for long-form from day one.
Features
Purpose-built tools for every stage of long-form writing.
Organize any project into parts, chapters, and folders. Drag-and-drop restructuring that scales from a 10-chapter essay to a 300-page book.
Switch between Drafter, Researcher, Devil's Advocate, Developmental Editor, Proofreader, Fact-Checker, and more — each with its own system prompt and model.
Scan any chapter for factual claims. Each is scored by confidence level and can be individually verified against academic databases.
Link quotes and passages directly to your uploaded sources. Citations are tracked per chapter and formatted automatically on export.
Every save creates a snapshot. Browse the last 50 revisions per chapter and restore any previous draft with one click.
Extract people, places, concepts, and claims from your manuscript on demand. Visualize how entities connect across chapters.
Invite co-authors, editors, or researchers with OWNER, EDITOR, or VIEWER permissions. Inline comments keep feedback organized.
A 0–100 score across chapter completion, verified claims, research depth, editorial polish, and citations. Know where your book actually stands.
Search OpenAlex, Semantic Scholar, PubMed, and arXiv simultaneously. Save papers and PDFs directly to your project research library.
Export to Markdown, HTML, DOCX, PDF, EPUB, or Standard Manuscript Format (SMF) — with table of contents and bibliography included.
Upload samples of your writing. Syntaxer learns your style and injects it into every AI generation so drafts sound like you, not like AI.
Full manuscript in a clean, distraction-free reading view. Review your entire book as a reader would, chapter by chapter.
Complete Project Context
When you ask Syntaxer a question or trigger a writing mode, it draws from your complete manuscript — every chapter, every source, every revision — not just whatever you've pasted into a chat window.


Writing Voice Studio
Upload samples of your own writing. Syntaxer embeds your style — sentence rhythm, vocabulary, what you avoid — and injects it into every AI-assisted draft so the output sounds like a first draft from you, not a chatbot.

Research & Claims
Search OpenAlex, Semantic Scholar, PubMed, and arXiv simultaneously and save papers directly to your project. Upload your own PDFs and documents — Syntaxer extracts and indexes everything. Then scan any chapter for factual claims and verify each one against academic databases.
Editorial Intelligence
Run a manuscript health check across your entire project. Syntaxer generates structural summaries for every chapter and analyzes the full manuscript for continuity, argument coherence, repetition, and pacing — then gives you a 0–100 readiness score you can actually act on.


Getting Started
Start from a project type — Book, Memoir, Research Report, How-To Guide, Essay — and Syntaxer creates the right chapter structure automatically. Paste your own outline, or let the AI outline assistant build one from your book idea.
AI Outline Assistant
Describe your book and the AI Outline Assistant builds a complete chapter structure — parts, chapters, and chapter descriptions — tuned to your project type. Paste your own outline in plain text, or refine the AI draft through conversation until it matches your vision exactly.


Source Management
Your research library lives inside the project. Upload PDFs, paste article links, or save papers directly from academic search. Every source is extracted, chunked, and vector-indexed — so when you write, Syntaxer can surface relevant passages and suggest citations from your actual library.
Read Mode
Switch to Read Mode at any time and your entire manuscript renders as a clean, beautifully typeset book — chapter by chapter, no toolbars, no distractions. It's the fastest way to catch issues you miss in the editor: pacing, transitions, and chapter flow become obvious when you read continuously.

Export
Six export formats — table of contents and bibliography included automatically.
Join researchers, journalists, and nonfiction authors building their best work in Syntaxer.